Northern Illinois University, Boiler Room Addition

Total Project Cost: $20,600,000

Strong Values, Customer Oriented, We Deliver

Project #: 230712A
Project Type: Institutional
Owner: State of Illinois, NIU
Client: Valdes Engineering and Architecture
Sq Footage: 12,130
Project Description:

Addition of new central boilers for campus steam supply system and administrative offices to support operation of the West boiler plant. My firm worked with Valdes Architecture and Engineering, Inc. to perform HVAC and plumbing design for the administrative building and provide heating and ventilation/make-up air for the boilers in this new addition and existing boilers located within the existing boiler plant. Valdes provided Revit modeling for this work so my firm performed load calculations, selected all equipment, developed mark-ups for production for drawings, provided written specifications for this project and back-checked all drawings. Deliverables included 30% IFR, 60% IFR, 90% IFA and 100% Construction Documents. My firm is also providing full Construction Administration for this project.

Project History

#
$
August 7, 2023

Contracted On

October 30, 2024

Design Completed

September 07, 2023

Construction Began

March 14, 2026

Construction Completed