Mallinckrodt B6 Warehouse Cooling

Total Project Cost: $350,000

Strong Values, Customer Oriented, We Deliver

Project #: 230913A
Project Type: Warehouse
Owner: Mallinckrodt, Greenville Facility
Client: Mallinckrodt, Greenville Facility
Sq Footage: 40,820
Project Description:

Addition of HVAC cooling and circulation fans to meet cGMP warehouse requirements defined by the Owner. My firm performed HVAC loads and developed a schematic design narrative outlining required equipment and HVAC layout. This also included verification of battery exhaust with make-up air requirements for pressurization.  The Owner was to procure equipment and work with local contractors to complete installation. HVAC equipment included packaged electric HVAC unit for cooling, transfer fans, exhaust fan with pressure controls and circulation fans. Deliverables included the Narrative and sketches which included equipment schedules.

Project History

#
$
November 21, 2023

Contracted On

December 1, 2023

Design Completed

February 26, 2024

Construction Began

August 15, 2024

Construction Completed