Mallinckrodt B11 Process Addition

Total Project Cost: UKN

Strong Values, Customer Oriented, We Deliver

Project #: 210719A,B
Project Type: Industrial, Pharmaceutical
Owner: Mallinckrodt - Greenville Facility
Client: McGrath & Associates, Inc.
Sq Footage: 12,500
Project Description:

A new process was added to this existing facility which included a three story addition and cGMP Warehouse addition. The design included a Facility Utility Study to determine what utilities could be leveraged for this addition, Schematic Design including Utility Summary and full design documents including process HVAC, HPS/HPC, USP, CA, CCA, Nuisance Dust Collection and Potable/Non-Potable Plumbing systems. The design also included cGMP required documents including Classification, Pressurization, HVAC Zoning and Airflow Diagrams. We performed full CA for this project, performing full Revit Coordination Modeling for MEPFP systems.  We led the model coordination and ultimately produced field fabrication drawings for systems we had designed.  We were also heavily involved with Start-up and Cx of all systems we designed.

Project History

#
$
September 8, 2021

Contracted On

June 10, 2022

Design Completed

July 15, 2022

Construction Began

April 15, 2024

Construction Completed