Maplewood Facility, Cooling Tunnel Upgrades
Total Project Cost: $2,700,000
Strong Values, Customer Oriented, We Deliver

Design of new Process Cooling system for existing Cooling Tunnel including Cooling Tower, Remote Sump, Pumps, Filters, Piping and Controls. This project included additional pumps for circulation to existing sump and heat exchanger for other process cooling needs. The total flow rate for both systems was 2,300 GPM and included accomodation for a future Cooling Tower cell. Our scope included complete design with P&ID’s, CA Services, full Commissioning Servicea and very close coordination with the facility’s control team. All controls for this project Allen Bradley and tied into existing PLC control systems. Thw Owner performed their own programming based on the project Sequence of Operations.